Victor Harbor transport consultation, 2026
A traffic simulation of the whole town, run on the council's proposed changes and on cheaper alternatives.
Brent Jacobs, Encounter Bay resident and ratepayer, writing independently. "Now" is built on 2025 data. Use the arrow keys, tap or swipe.
The proposal
I simulated it against today's roads, with today's traffic.
1 · Worse, for no traffic gain
more time stopped in queues on a summer peak day
That is +275 vehicle-hours a day, and about +28 seconds per trip on average. On a school-term weekday: +58% and +14 s per trip. Most trips change by seconds; the cost lands on particular streets.
2 · Trucks on the foreshore
Today
trucks a day
Council package
trucks a day (loop alone ~160)
Summer day, via Bridge Tce and north Flinders Pde, the foreshore end of the town centre. All traffic there roughly doubles.
2 · Side streets
Today
wait
Council package
wait
Acraman St carries about three times today's traffic, and already has crash hotspots. Inman St / Newland St: 38 s → 81 s.
2 · Why it spreads
Slow the town centre, and traffic moves into residential streets the plan does not mention.

Summer, same moment: today | council package (14 cars queued) | targeted fixes.
3 · Never tested or costed
3 · The State's own guide
A 30/40 km/h limit "is not intended for streets with short holiday or tourism peaks"
Freight and major traffic routes are "unsuitable". Torrens St and Hindmarsh Rd are State roads and freight routes.
4 · Cheaper, targeted fixes do better
N9: turn lanes on Crozier Rd at Armstrong Rd + a roundabout at Hindmarsh Rd / Grantley Ave. N7: roundabouts on Armstrong Rd at Crozier and Greenhills, and at Hindmarsh / Grantley. 2041 = in about 15 years, high growth. Rough layouts, not designs.
5 · Ring road and 6 · Growth
Widening today's ring to four lanes alone makes 2041 worse unless the Crozier Rd junction is fixed (wait about 29 s → 50–55 s).
Option 1 (new outer ring road, old ring at 60 km/h): +18–30% queueing in 2041, and about 28% more trucks in the town centre. Option 2 + junction fixes: −24%.
today's time stopped, term weekday, 2041 high growth. Summer jams in every option. The whole network, with its future streets, must be modelled before committing.
7 · What we ask Council
8 · How sure · 9 · Explore it yourself
Simulation of Urban Mobility (SUMO), an open-source simulator, built from OpenStreetMap, Australian Bureau of Statistics (ABS), DIT and council data. Partly calibrated; town-centre delays are more likely understated. Read results as differences, not exact times.
br3nt.github.io/victor-harbor-roads