S7 — Where the delay is, and targeted options aimed at it

Stream S7 (integration, 21–22 Nov 2026). Part 1 diagnoses where the simulated delay is on today's network; part 2 defines options aimed at those places (ids N2–N9 in sim/SCENARIOS.md); part 3 gives their results against today's network, the council's package (CP) and Brent's package (BP). Each assumption has a value, a reason and how sensitive results are to it.

Tools: python -m vhsim.integration.bottlenecks diagnose|hotspots ... (from sim/; outputs in sim/data/results/s7_diagnosis/). Measure: vehicle-hours stopped (SUMO edgeData waitingTime, speed below 0.1 m/s), the same quantity as the "time stopped" in report_2025_base/summary.csv but summed per edge, seed mean of 3 runs. The edgeData total is a little below the trip total (440 vs 460 vehicle-hours in summer 2025) because edgeData is written without internal lanes (vhsim.metrics.run): time stopped inside a junction, mostly right-turners waiting at the turn line, is on no edge. Per-approach and hotspot figures therefore slightly undercount right-turn waits; the trip totals in part 3 include them.

1. Diagnosis (today's network)

Totals and time of day

Run (today's network, 3 seeds) Vehicle-hours stopped / day (edgeData) Worst hour Share 10:00–17:00
2025 term weekday 128 12:00–13:00 (19) 83%
2025 summer peak day 440 12:00–13:00 (84) 87%
2041 high growth, term weekday 584 12:00–13:00 (116) 89%

Delay is a midday problem (the counts' midday peak, S3), not a commuter-peak one. In summer it builds from 09:00, peaks at 12:00–13:00 and stays high until 16:00.

Hotspots (vehicle-hours stopped per day)

A hotspot is a bottleneck's whole queue: every approach (and its turn bay) ending at the listed junction nodes. Definitions in vhsim.integration.bottlenecks.HOTSPOTS. Edges a scenario adds other than S7 ring edges (e.g. the B5/BP slip lanes s6_slip_*) belong to no hotspot, so for B5/BP the hotspot figures leave out waiting on the slips; the network total includes it.

Hotspot 2025 weekday 2025 summer 2041 high weekday
Victoria St, Bay Rd to Torrens St (its own through approaches, side streets, car-park accesses) 22.4 77.4 110.2
Hindmarsh Rd side streets north of the town centre (Wattle Dr, The Drive, Renown Ave, The Parkway, Adare Ave, Peace Ave, Rupara Ave) 15.2 48.8 39.4
Hindmarsh Rd / Grantley Ave / Bridge Tce (rail-crossing link) 5.4 32.6 20.3
Torrens/Seaview/Eyre roundabout + Eyre Tce / McKinlay St 6.1 28.7 24.5
Armstrong Rd / Crozier Rd 3.0 18.2 54.3
Torrens St / Coral St 5.1 12.2 13.9
McCracken roundabout 4.9 10.2 9.3
Crozier Rd / Burke St 1.4 9.3 15.0
Bay Rd / Victoria St / George Main Rd roundabout 2.2 5.6 5.5
Torrens St / Crozier Rd roundabout 1.7 4.8 5.5
Armstrong Rd / Greenhills Rd 0.5 1.6 12.0
All eleven 68 (53%) 249 (57%) 310 (53%)
Network total 128 440 584

The rest (about 45%) is spread thinly over hundreds of give-way junctions, driveways and car-park exits, none above about 6 vehicle-hours a day.

Top approaches (2025 summer peak day)

Junction Approach Vehicles/day Veh-h stopped s stopped / vehicle Worst hour
Bridge Tce at the Grantley Ave crossing Bridge Tce 217056482#0 2,755 23.1 30 15:00
Armstrong Rd / Crozier Rd Crozier Rd 39946279 3,182 14.8 17 12:00
Victoria St at the IGA car-park entry Victoria St eastbound 173449383#3 9,588 13.4 5 15:00
Victoria St at the IGA car-park entry car-park exit -1432093544 992 11.3 41 11:00
Granite St / Victoria St Granite St 42530572#1 1,218 10.8 32 11:00
Hindmarsh Rd / Wattle Dr Wattle Dr -43152356#0 1,006 10.2 37 11:00
Torrens/Seaview/Eyre roundabout Eyre Tce 184390356 2,616 9.6 13 12:00
Eyre Tce / McKinlay St McKinlay St 42645831#7 1,845 8.7 17 12:00
Crozier Rd / Burke St Burke St 1242247847#2 1,842 8.4 16 12:00
Victoria St / Oval Rd Victoria St eastbound 173449383#0 10,870 8.3 3 11:00
Hindmarsh Rd / Grantley Ave crossing link -184390360#1 2,154 8.1 14 12:00
Victoria St / Oval Rd Victoria St westbound 1242247851#0 12,096 7.3 2 12:00
Torrens St / Coral St Coral St 60269602#2 1,387 7.0 18 12:00
Bay Rd / Bartel Blvd Bartel Blvd -183540840#0 3,246 6.5 7 12:00
Hindmarsh Rd / Renown Ave Renown Ave 46824061#2 794 6.4 29 12:00

(2025 weekday and 2041 tables: sim/data/results/s7_diagnosis/*__approaches.csv.)

What the delay is

  1. Side-street right turns onto busy one-lane arterials are most of it. Movement detail (movements.csv, summer 2025): Bridge Tce traffic turns left into the 17 m Grantley Ave crossing link (50 s mean wait) and then right onto Hindmarsh Rd (20 s) — the link holds two cars, so the right-turners' wait backs up into Bridge Tce. Wattle Dr right onto Hindmarsh Rd: 48 s. Granite St right onto Victoria St: 45 s. Coral St right onto Torrens St: 27 s. Crozier Rd onto Armstrong Rd: left 32 s and right 25 s (left-turners queue behind right-turners in the one shared lane).
  2. Victoria St between Bay Rd and Torrens St is a chain of closely spaced give-way junctions and car-park accesses on a one-lane-each-way street carrying 10,000–12,000 vehicles a day in summer: 2,400 a day turn left into Oval Rd (17 s each, slowing the through lane), 980 turn left into the IGA car park (1,400 at 2041 high growth), the car-park exit waits 41 s, Granite St's right turn 45 s, and the westbound queue from the Bay Rd roundabout entry reaches back 120 m. Caution: the calibration over-loads Victoria St (1.53 x the DIT count, A-INT-04) and models the car parks with a few OSM service roads, so this hotspot is the least trustworthy; a real fix here needs the car-park access design, which the model cannot test.
  3. The roundabouts are not the main problem today. Mean approach delay at the two Torrens St roundabouts (Seaview/Eyre and Crozier) is 3–8 s on most approaches; the exceptions are Eyre Tce (13 s weekday, 20 s summer), Seaview Rd (8 / 13 s) and Crozier Rd from the west (5 / 8 s); at Torrens/Victoria/Wills, Wills St 7 / 10 s; at McCracken the three main legs 3–8 s (a minor leg 9 / 14 s); at Bay Rd 2–7 s (report_2025_base/intersections.csv). This is why the council's signals (C4) and Brent's slip lanes (B5) do not help: they replace or bypass junctions that are not where the queues are.
  4. At 2041 high growth the ring road's give-way junctions fail. Armstrong Rd / Crozier Rd becomes the worst junction in town (54 vehicle-hours; Crozier Rd waits 53 s a vehicle, its left-turners 92 s); Armstrong Rd / Greenhills Rd grows from 0.5 (2025 weekday) to 12. The growth areas load onto the rural roads north of the ring (Waggon Rd, Day Rd, Greenhills Rd, Fuller Rd; S2 M3/M15) and cross or join the ring road at these give-way junctions. Both packages make this worse: CP 92, BP 106, B3 alone 92 vehicle-hours at Armstrong/Crozier (more traffic on the ring road, fewer gaps for Crozier Rd).

2. Options and their assumptions

General: every option is a netconvert patch over the baseline (vhsim.scenarios.defs, patches in sim/data/networks/patches/<id>/, built with python -m vhsim.scenarios.build <id> --smoke), then the A-INT-01 turn bays as for every scenario. All pass the connectivity checks and the 30-minute smoke run.

S7-01. New single-lane roundabouts (N2, N4, N5)

S7-02. Approach flares and turn lanes (N3, N8)

S7-03. No right turn out (N6)

S7-04. Cost classes

S7-05. Options considered and not built

3. Results

Runs: python -m vhsim.integration.batch as for every scenario (A-INT-02/03 settings, rerouting on), 2025 base demand 3 seeds per condition, 2041 high-growth term weekday 1–3 seeds per option (3 for today's network, CP, BP, B3). Tables: python -m vhsim.integration.s7_tables (from report_<year>_<growth>_s7/ and s7_diagnosis/hotspots__*.csv). "Time stopped" is the trip total (tripinfo waitingTime), as in the main report; hotspot numbers are edgeData vehicle-hours as in part 1. Summer runs vary a lot between seeds (today's network 450–472, BP 437–546 vehicle-hours), so differences under about 10% in summer are within the noise unless the seed ranges separate.

2025 (today's demand)

Scenario Weekday: trip Δ (s) Weekday: time stopped (veh-h, seed range) vs today Summer: trip Δ (s) Summer: time stopped (veh-h, seed range) vs today vs CP vs BP
Today's network 0 137 (134–142) — 0 460 (450–472) — −37% −6%
CP council package +14.4 216 (205–224) +58% +28.2 734 (714–754) +60% — +49%
BP Brent's package −2.4 134 (132–137) −2% 0 492 (437–546) +7% −33% —
N2 Armstrong/Crozier roundabout +1.8 140 (139–141) +3% +4.2 490 (472–504) +7% −33% 0%
N3 Crozier Rd flare −0.6 132 (132–134) −3% −2.4 426 (408–445) −7% −42% −13%
N4 Hindmarsh/Grantley roundabout +0.6 125 (124–127) −8% 0 429 (404–477) −7% −42% −13%
N5 N2 + Armstrong/Greenhills roundabout +3.6 144 (143–146) +5% +6.6 505 (489–514) +10% −31% +3%
N6 no right turn out of 3 side streets +0.6 138 (137–140) +1% +8.4 561 (518–641) +22% −24% +14%
N7 N5 + N4 +4.2 134 (131–140) −2% +1.8 412 (399–427) −10% −44% −16%
N8 Victoria St left-turn lanes 0 138 (134–140) +1% +2.4 500 (479–526) +9% −32% +2%
N9 N3 + N4 0 122 (120–123) −11% −3.6 378 (364–386) −18% −49% −23%

Vehicle-hours stopped at the hotspots, summer peak day (edgeData, seed mean):

Scenario Armstrong/Crozier Grantley/Bridge Tce Victoria St Hindmarsh side sts Seaview rbt + Eyre Torrens/Coral Network
Today 18.2 32.6 77.4 48.8 28.7 12.2 440
CP 37.1 5.3 113.6 49.7 20.9 7.1 714
BP 36.6 32.7 80.0 44.6 22.8 10.9 470
N2 2.8 36.7 91.0 50.4 30.1 12.4 470
N3 11.5 32.2 68.8 47.4 26.3 11.9 407
N4 24.1 12.6 86.5 53.5 17.6 8.3 412
N6 26.5 33.9 97.6 78.3 29.9 1.2 541
N7 2.4 16.4 70.4 64.0 20.4 8.5 395
N8 18.6 34.3 103.7 48.5 28.4 11.5 477
N9 12.0 12.0 66.7 52.5 16.5 8.4 360

Mean delay on the key approaches, summer (s per vehicle, R15 definition): Crozier Rd at Armstrong Rd today 29, CP 43, BP 52, N2 7, N3 16, N9 16; Bridge Tce at the crossing today 51, CP 10 (traffic pushed elsewhere by the loop), BP 52, N4 16, N9 16; Eyre Tce at the Seaview roundabout today 20, N4 17, N9 16. Full tables: report_2025_base_s7/intersections.csv.

Reading: - N4 and N3 each help on their own, and together (N9) they are the best option tested at today's traffic: 11% less time stopped on a term weekday and 18% less on a summer day, trips 3.6 s shorter in summer, with seed ranges well clear of today's (364–386 vs 450–472). N4 gives the Bridge Tce / Grantley traffic a roundabout instead of a right turn across both Hindmarsh Rd streams, and also takes load off the Seaview/Eyre roundabout (drivers who now use Grantley instead). N3 stops Crozier Rd's left-turners queuing behind right-turners. Both packages are worse than today in summer; N9 is 49% below CP and 23% below BP. - N2 fixes its own junction and still loses overall at today's traffic. Armstrong/Crozier drops from 18 to 3 vehicle-hours in summer, but the network total rises 7% (seed ranges 472–504 vs 450–472, so this is not noise) and trips are 2–4 s longer. Two effects: every vehicle on the 100 km/h ring road now slows to the 27 km/h ring, and the easier Crozier Rd exit draws traffic down Crozier Rd and into the Victoria St corridor (+14 vehicle-hours there) and George Main Rd. N5 adds a second ring-road roundabout and is worse again (+5% / +10%). The cheap flare (N3) is the better answer at this junction until traffic grows. - N6 (turn bans) makes summer worse (+22%). Granite St's wait falls from 44 to 12 s and Coral St's queue disappears, but the displaced right-turners go round via the Hindmarsh Rd side streets (49 → 78 vehicle-hours) and Victoria St. Banning turns moves the delay. - N8 (Victoria St left-turn lanes) does nothing useful (+1% weekday, +9% summer, within or near the summer noise). The Victoria St queues are not mainly caused by slowing left-turners in this model; see the caution on Victoria St in part 1. - Trucks on the foreshore (vehicle-km on Flinders Pde and the Esplanade) stay at 4–8 a day for every N option, against 10–17 under CP.

2041 high growth, term weekday

Scenario Seeds Mean trip (min) Trip Δ vs today's network (s) Time stopped (veh-h, seed range) vs today's network vs CP vs BP
Today's network 3 6.65 0 608 (589–619) — −38% −37%
CP council package 3 7.14 +29.4 976 (910–1,084) +61% — +1%
BP Brent's package 3 6.98 +19.8 965 (773–1,189) +59% −1% —
B3 four-lane ring road 3 6.75 +6.0 748 (698–785) +23% −23% −22%
N2 Armstrong/Crozier roundabout 1 6.64 −0.6 559 −8% −43% −42%
N3 Crozier Rd flare 2 6.61 −2.4 571 (538–604) −6% −42% −41%
N4 Hindmarsh/Grantley roundabout 2 6.71 +3.6 634 (510–757) +4% −35% −34%
N5 N2 + Armstrong/Greenhills roundabout 2 6.62 −1.8 513 (497–529) −16% −47% −47%
N7 N5 + N4 2 6.59 −3.6 465 (454–476) −24% −52% −52%
N9 N3 + N4 3 6.62 −1.8 556 (509–642) −9% −43% −42%

Hotspots (edgeData vehicle-hours; Armstrong/Crozier, Armstrong/Greenhills, Grantley/Bridge Tce, Victoria St): today 54 / 12 / 20 / 110; CP 92 / 16 / 3 / 154; BP 106 / 26 / 16 / 194; N5 4 / 3 / 21 / 96; N7 4 / 3 / 7 / 98; N9 54 / 13 / 7 / 113. Crozier Rd's mean wait at Armstrong Rd: today 74 s, CP 100, BP 130, N3 52, N5 and N7 8 s.

Reading: - At high growth the ring-road junctions decide the result. With roundabouts at Armstrong/Crozier and Armstrong/Greenhills (N5, N7) the runs are lower and much more stable between seeds; without them (N3, N4, N9) the Crozier Rd queue at Armstrong Rd tips into long queues on some seeds and the totals swing (N4: 510 on one seed, 757 on the other). N7 is the best option tested: 24% less time stopped than today's network at 2041 demand and about half of either package's, trips 3.6 s shorter. - This reverses the 2025 ranking at Armstrong/Crozier: the roundabout (N2/N5) costs a little at today's traffic and pays at 2041 high growth; the flare (N3) helps today and is not enough in 2041. A staged reading: flare now, roundabout when growth area traffic arrives. - No option copes with 2041 high growth. N7's 465 vehicle-hours a day is still 3.4 times today's weekday (137). The growth areas load onto existing rural roads (no estate streets or new links, S2 M3/M15), so the growth result says more about where growth traffic is forced to go in the model than about a planned 2041 network. - One or two seeds per option and a large seed spread for N4 and N9: the 2041 differences under about 15% are not firm. N5 and N7 are clear of today's range on both seeds.

What clearly helps

Option Today's traffic (2025) 2041 high growth Cost class
N9 Crozier Rd flare + Hindmarsh/Grantley roundabout Best: −11% weekday, −18% summer time stopped; summer trips −3.6 s; seed ranges clear of today's −9%, noisy (509–642) $$–$$$
N7 roundabouts at Armstrong/Crozier, Armstrong/Greenhills and Hindmarsh/Grantley −2% weekday, −10% summer, trips +2–4 s Best: −24%, stable $$$
N3 Crozier Rd flare alone −3% / −7% −6% $
N4 Hindmarsh/Grantley roundabout alone −8% / −7% +4%, very noisy $$–$$$

Every N option except N6 is far better than the council package (CP is +58–61% on time stopped in every condition). Against Brent's package: on a summer day N3, N4, N7 and N9 are 13–23% lower; on a term weekday the packages and options are within a few per cent except N4 (−6%) and N9 (−9%); at 2041 high growth every option run is 34–52% lower, because BP (with its four-lane ring road) is as bad as CP.

A combined reading: N9 now (Crozier Rd flare and a Grantley roundabout), and the Armstrong Rd roundabouts (N5, which replaces the flare) when growth-area traffic arrives, i.e. N7 by the 2030s under high growth. Did not help: N2/N5 at today's traffic, N6 turn bans, N8 Victoria St left-turn lanes.

Caveats

Grantley Ave in the viewer: a 53-minute difference that was an export artefact (22 Nov 2026)

The residents' site showed Grantley Ave → Woolworths on a 2025 summer peak day at 12:30 as 53 minutes faster under the council package than today (56.6 minutes today). Checked against the three 2025 summer runs of today's network: - Not a real queue. The vehicles' own exit times (vehroute) give the longest traversal of the Grantley Ave section before Hindmarsh Rd (-42530401#0, 194 m) between 12:00 and 13:00 as 70, 97 and 79 s in seeds 1–3 (22, 15 and 15 vehicles). The queue there is a normal side-street wait of under a minute and a half. - Not a stuck vehicle or a teleport. No teleport on Grantley Ave, Bridge Tce or the crossing link in any seed (5, 2 and 1 teleports in the whole day elsewhere); the A-INT-02 impatience and junction-blocker settings are not involved. - The cause: SUMO's edgeData traveltime (length × vehicle-seconds ÷ distance the vehicles' fronts travelled). In 12:15–12:30, seeds 2 and 3 each saw a single vehicle that had been waiting at the stop line since before 12:15; it moved a few centimetres and left after 12 s and 7 s. SUMO extrapolated 19,308 s and 9,678 s; the seed mean reached the export format's cap (6,553 s), and the viewer interpolated that into the 12:30 departure. - Fix (export layer, assumption V1a in S5-viewer.md): when the vehicles covered less than one edge length in the interval, the edge time is the vehicle-seconds observed plus free flow over the rest of the edge. Grantley Ave at 12:15 becomes 24 s (seed mean); Grantley Ave → Woolworths at 12:30 becomes 2.7 minutes today against 3.6 minutes under the council package (the package is about a minute slower, not 53 minutes faster). In the 2025 summer baseline the rule changes 517 of 449,568 edge-intervals by more than a second and 17 by more than 5 minutes, all on short local streets and car-park aisles. Published runs are re-timed with python -m vhsim.viewer.retime. - N4/N9 do not depend on it. Every number in this note (time stopped from tripinfo, hotspot vehicle-hours from edgeData waitingTime, approach delays from vehroute exit times) is computed without traveltime, so the N4/N9 summer results stand (time stopped −7% and −18%; Bridge Tce at the crossing 51 → 16 s a vehicle). The artefact only affected the viewer: it put the same false 56-minute value on that section in today's network and in N4 (both 56.4–56.6 minutes at 12:30), and none in N9 or the council package, so before the fix the residents' site overstated the gain of N9 and CP at that one section and time, and understated N4's.

C5 (outer freight ring road) — not built here; see S9

Built afterwards from the described end points and existing roads: sim/assumptions/S9-ring-road.md. The original reason for leaving it out follows. The indicative alignment (S-A04b) could not be placed reliably. Georeferencing the map from road junctions the map labels (Greenhills/Hutchinson Rd, Hutchinson/Hindmarsh Tiers Rd, Greenhills/Day Rd) gave scales that disagree by nearly a factor of two (the labelled junctions cannot be pinned on the map), so the new sections (south-west across the Inman River to Greenhills Rd, and the north/north-east section to Victor Harbor Rd) would have invented end points. The parts that follow existing roads (Greenhills Rd from Day Rd north, Hutchinson Rd, then Hindmarsh Tiers Rd) are already in the network at 50–100 km/h. In this demand model C5 could only attract through traffic between Inman Valley Rd and Victor Harbor Rd, a small flow, and would not touch the bottlenecks in part 1. It needs the council's alignment (or a careful georeferencing like S2's for the growth map) before it is worth simulating.

By Brent Jacobs · 22 November 2026