S9 — The council's ring-road options (VHITS Option 1 vs Option 2)

Stream S9 (22 Nov 2026). Brent's question: "what of the ring route options?" The October 2026 consultation (S-A03 p.5, S-B03 pp.91–94, S-A05) offered two:

Every year is stated: "2025" is the model's now (2025 demand data, the latest available in 2026); 2031 and 2041 are the S2 growth scenarios (UGMS moderate and high series).

1. How C5 was built

The council's ring-road map (S-A04b, S-B03 p.94) draws the outer road as an "indicative" dashed line. S7 tried to georeference it and failed: the labelled junctions gave scales nearly a factor of two apart (the map is schematic). So C5 is not traced from the drawing. It is built from the route the text and map describe — from Inman Valley Rd near Greenhills Rd, north along the west of the growth area to Hutchinson Rd, then east across Hindmarsh Tiers Rd to Victor Harbor Rd — using existing OpenStreetMap roads and road reserves wherever they follow that description, plus short new sections where none do. Two readings are built.

S9-01. Route, C5 (inner reading: along Greenhills Rd, as the map's line)

Section Length Today In C5
Swains Crossing Rd, Inman Valley Rd → Cemetery Rd (crosses the Inman River at Swains Crossing) 0.8 km 50 km/h tertiary 100 km/h
New link along the Water Reserve Rd line to its south end 0.4 km — new, 100 km/h
Water Reserve Rd (unsealed road reserve) to Greenhills Rd 0.5 km 50 km/h residential 100 km/h
Greenhills Rd, from its southern bend past Day Rd to Hutchinson Rd (west edge of growth areas 1 and 3) 3.6 km 50 km/h 100 km/h
Hutchinson Rd 3.4 km 80 km/h 100 km/h
Hindmarsh Tiers Rd, Hutchinson Rd → Victor Harbor Rd 1.3 km 100 km/h 100 km/h
Total 9.9 km, of which 0.4 km new

S9-02. Route, C5b (outer reading: west of Greenhills Rd)

Section Length Today In C5b
Swains Crossing Rd (as C5) 0.8 km 50 km/h 100 km/h
Stock Rd 1.1 km 50 km/h unclassified 100 km/h
New link Stock Rd → Spring Rd 0.2 km — new
Spring Rd and the Glenvale Rd stub to Cartwright Rd 0.4 km 50 km/h 100 km/h
New road, straight north 0.3–0.9 km west of Greenhills Rd, to the Greenhills Rd / Hutchinson Rd junction 2.8 km — new
Hutchinson Rd 3.4 km 80 km/h 100 km/h
Mont Rosa Rd, straight across Hindmarsh Tiers Rd to Victor Harbor Rd (further north than C5) 1.1 km 100 km/h residential 100 km/h
Total 9.7 km, of which 3.0 km new

C5b keeps the outer road off the growth areas' Greenhills Rd frontage (driveways, future estate entries), which is how a freight bypass would normally be placed, and reaches Victor Harbor Rd by the shortest line "across Hindmarsh Tiers Rd" as the text says. C5 is the cheaper reading (0.4 km new road) and follows the map's line up Greenhills Rd. Both are inferences; neither is a design.

S9-03. Cross-section and junctions

S9-05. Trucks prefer the outer road

S9-06. What the model can and cannot say about Option 1

2. Runs

Network builds: python -m vhsim.scenarios.build c5 --smoke and ... c5b --smoke (checks and 30-minute smoke run clean). Runs as every scenario (A-INT-02/03 settings, rerouting on, 45-minute wall-clock cap, A-INT-05):

Demand Conditions Seeds Today's network, B3 N7 C5, C5b
2025 ("now") term weekday, summer peak day 3 earlier runs earlier runs (S7) S9
2031 moderate, 2031 high term weekday, summer peak day 1 earlier runs (timeline) runs from the parallel S7 stream S9
2041 high term weekday 3 earlier runs seeds 1–2 (S7) + seed 3 (S9) S9

C5s (sensitivity, python -m vhsim.scenarios.build c5s --smoke): the C5 outer road and truck preference with Welch Rd / Armstrong Rd left at today's limits; planned for 2041 high weekday (3 seeds) and 2031 high summer.

Analysis: python -m vhsim.integration.s9_ring (reads the run directories; CSVs in sim/data/results/report_s9/).

3. Results (22 Nov 2026; some runs missing, see the gaps list)

python -m vhsim.integration.s9_ring → sim/data/results/report_s9/summary.csv. "Time stopped" is total vehicle-hours stationary (tripinfo); changes are against today's network on the same seeds. "Ring junctions" = vehicle-hours stopped on the approaches of Armstrong Rd's four junctions (Inman Valley roundabout, Crozier Rd, Greenhills Rd, Welch/Waggon Rd). Trucks = trucks a day using any town-centre street (the C1 area) / the existing ring road / the outer-road streets.

2041 high growth, term weekday (3 seeds each)

Option Mean trip (min) Δ trip Time stopped (veh-h, seed range) vs today Ring junctions (veh-h) Trucks: town centre / ring / outer Growth areas ↔ town centre (min)
Today's network (Option 2 as is) 6.65 — 608 (589–619) — 77.8 394 / 411 / 130 7.4
N7 junction roundabouts (Option 2 + fixes) 6.59 −4 s 462 (454–476) −24% 17.4 383 / 403 / 130 7.1
B3 four-lane ring road 6.75 +6 s 748 (698–785) +23% 135.1 392 / 436 / 133 7.5
C5 outer road via Greenhills Rd (Option 1) 6.92 +16 s 714 (692–726) +18% 8.5 502 / 29 / 272 7.8
C5b outer road west of Greenhills Rd (Option 1) 7.03 +22 s 792 (752–815) +30% 14.0 509 / 38 / 271 7.9

Vehicles a day, 2041 high weekday: Armstrong Rd between Greenhills Rd and Waggon Rd 13,844 today → 6,293 (C5) / 6,473 (C5b); Hutchinson Rd 240 → 3,374 / 2,993; Swains Crossing Rd 2,012 → 5,404 / 4,864. Vehicle-km a day (seed mean, edgeData): Hindmarsh Rd 37,900 → 43,400 (+14%), Adelaide Rd 8,300 → 10,200 (+23%), town-centre streets 10,400 → 11,100 (+6%), Armstrong + Welch Rd 71,800 → 35,500 (−51%).

2025 summer peak day ("now", 2025 demand)

Only seed 1 of C5 finished (C5b none): time stopped 834 vehicle-hours against 457 for today's network on the same seed (+83%), trips +34 s, trucks using town-centre streets 586 → 797 a day. N7: −10% (3 seeds, 399–427 vs 450–472); B3: +4% (noise).

2031 (1 seed each)

Today's network / N7 / B3 finished (N7 2031 from the parallel S7 stream): N7 −4% (moderate) and −6% (high) on a term weekday, −43% and −37% on a summer day; B3 −2% / −1% weekday, +2% / +126% summer. No C5 or C5b 2031 run finished (see gaps).

Where Option 1's delay comes from

Lowering Welch Rd / Armstrong Rd to 60 km/h makes the ring road no faster than going through town, so about half its traffic leaves it: some for the outer road (growth-area traffic heading north, through traffic), the rest onto Hindmarsh Rd, Adelaide Rd and the town-centre streets. The ring-road junction queues all but vanish (77.8 → 8.5 vehicle-hours at 2041 high growth, because there is less traffic and 60 km/h gaps are easier to accept), but the diverted traffic queues at the side-street and roundabout junctions in town: the largest increases at 2041 high growth are Bridge Tce at the Grantley Ave crossing (+17 vehicle-hours a day), Coral St / Torrens St (+10), Eyre Tce / McKinlay St (+5) and the Hindmarsh Rd side streets (Renown Ave, The Drive, The Parkway, Peace Ave, Wattle Dr, +2–4 each). Growth-area trips to and from the town centre take about 0.4–0.5 minutes longer (7.4 → 7.8–7.9 minutes), not shorter. The truck preference works on the ring road (trucks on it 411 → 29–38 a day) but trucks using town-centre streets rise (394 → about 505), because local deliveries that used the 100 km/h ring road now cut through town too.

C5s (the C5 outer road with the ring road left at today's limits) was built to separate the outer road from the 60 km/h downgrade; its runs did not finish in time (gaps).

4. Verdict: Option 1 vs Option 2 with targeted junction fixes

Sensitivity of the alignment

C5 (0.4 km new road, along Greenhills Rd) and C5b (3.0 km new road west of it, Mont Rosa Rd to Victor Harbor Rd) give the same picture: similar outer-road volumes (Hutchinson Rd about 3,000–3,400 a day), the same diversion into town; C5b is worse (+30% vs +18%); it leaves Greenhills Rd as a 50 km/h local road and its outer road is less direct for traffic from growth areas 1 and 3 beside Greenhills Rd (not separated further). The verdict does not depend on which reading is used; it depends on the 60 km/h downgrade (C5s, gap).

5. Gaps (runs that did not finish by the deadline)

The machine's load average reached 70–166 during the runs (other jobs), so most runs hit the 45-minute wall-clock cap (A-INT-05) while still progressing (for example C5 2031 moderate summer had 98% of trips finished at 22:00 when stopped); these are not gridlock results and are not recorded as jammed. A second pass with a 4-hour cap was running at the deadline and was stopped. Missing: - C5: 2025 summer seeds 2–3, 2025 term weekday (3 seeds), 2031 moderate and high (weekday and summer). - C5b: 2025 summer and term weekday (3 seeds each), 2031 moderate and high (weekday and summer). - C5s: 2041 high weekday (3 seeds), 2031 high summer. Rerun with python -m vhsim.integration.batch --scenarios c5 c5b c5s --conditions ... --year ... --growth ... when the machine is free (for 2041 high: C5 and C5b are done, run C5s only), then python -m vhsim.integration.s9_ring.

By Brent Jacobs · 22 November 2026