Scenario definitions

Each scenario = a network patch over the baseline (S1) and/or a demand variant (S2), run under each condition (weekday_term, saturday, summer_peak, event_nye) and demand year (2025/base, 2031|2041|2051 × moderate|high). Ids match the knowledge base Options Register (site/options-register.html).

Where the council has not defined an option precisely, the definition below is our reading of its map, marked Inference, and a variant tests the main alternative reading. Sources: VHITS town-centre map (S-A04c, S-B03 p.93), Vision map (S-B03 p.92), ring-road map (S-A04b, S-B03 pp.91, 94), fact sheet (S-A03), survey text (S-A05).

Baselines

Id Network Demand
X0 baseline (today) 2025/base — calibration target
X1 baseline each future year/growth ("do nothing")

Council options (VHITS preliminary Vision)

Id Change Definition used Status
C1 30 km/h town centre All edges inside the shaded town-centre area: bounded by Torrens St (west), Seaview Rd / Eyre Tce (north), Flinders Pde / foreshore (east), Esplanade (south). C1a: Torrens St and Victoria St stay at their current limit (they are DIT freight/strategic routes; S-D08, S-D22). C1b: Torrens St inside the area also 30 km/h. Inference — boundary is shading only
C2 Shared use zones 10–20 km/h 20 km/h on Ocean St (the 2014 Mainstreet plan's "shared space", S-B26) plus Albert Pl and Railway Tce within the area; pedestrian priority modelled as reduced speed plus pedestrian crossing delay at Ocean St / Coral St where SUMO supports it. C2b: 10 km/h. Inference — locations not named
C3 One-way outer loop Clockwise (reading of the map's arrows): Torrens St one-way north-east from Victoria St to the Hindmarsh/Seaview/Eyre roundabout; Eyre Tce → Flinders Pde one-way southbound to the Esplanade; Esplanade one-way westbound to the Victoria St / Albert Pl area; Victoria St stays two-way. Internal streets keep their current direction unless they conflict with the loop. C3b: anticlockwise. Inference — streets and direction never named in text
C4 Traffic signals Replace the roundabouts at Torrens St/Hindmarsh Rd × Seaview Rd/Eyre Tce and Torrens St × Crozier Rd with signalised intersections (actuated, fixed cycle ≤ 90 s, pedestrian phase on Torrens St). Lane layout: existing approach lanes (no land acquisition) — C4b: three lanes per approach at Seaview/Eyre as the 2015–16 study said signals there would need (S-D21 s13.3.14). Sites named in text (S-A03); design not published
C5 Outer freight ring road (Option 1), inner reading Built from the described end points over existing roads, not traced from the map (S9, sim/assumptions/S9-ring-road.md): Inman Valley Rd → Swains Crossing Rd (existing Inman River crossing) → new 0.4 km link → Water Reserve Rd → Greenhills Rd past Day Rd → Hutchinson Rd → Hindmarsh Tiers Rd → Victor Harbor Rd. Outer road 100 km/h, one lane each way, priority over the side roads it meets; at Inman Valley Rd it forms the main road with Inman Valley Rd west (town-bound traffic gives way); give-way to Victor Harbor Rd. Existing ring road (Welch/Armstrong Rd) lowered to 60 km/h; trucks prefer the outer road (SUMO routing preference: the link road counts at twice its travel time for trucks). "More connections to the north growth area" not modelled (no estate streets, S2 M3/M15). Inference — "indicative" alignment
C5b Outer freight ring road (Option 1), outer reading As C5, but Swains Crossing Rd → Stock Rd → new 0.2 km link → Spring Rd → new 2.8 km road 0.3–0.9 km west of Greenhills Rd (clear of the growth-area frontage) to Hutchinson Rd, then Mont Rosa Rd straight across Hindmarsh Tiers Rd to Victor Harbor Rd Inference — variant
C5s Sensitivity of C5 C5 with Welch Rd / Armstrong Rd left at today's limits (truck preference kept): separates the outer road from the 60 km/h downgrade Sensitivity (runs not finished, S9 gaps)
C6 Retain current ring road (Option 2) Baseline ring road; demand variant adds an activity centre (supermarket + services POIs) north of the ring road near Waggon Rd / Hindmarsh River (S-A03 p.5, S-B03 p.91). Demand-side change
CP Council town-centre package C1a + C2 + C3 + C4 together, as consulted. Package

Brent's options

Id Change Definition used
B1 Keep two-way streets = baseline network (no C3)
B2 Timed/event speed zones on variable signs 30 km/h on the C1 area edges only in event_nye and summer_peak 10:00–16:00; baseline limits otherwise
B3 Four-lane ring route Welch Rd + Armstrong Rd duplicated to two lanes each way (consistent with the Jan 2026 "duplication" note, S-B31); same speed limits
B4 Two-lane entry roundabout Adelaide Rd / Hindmarsh Rd / Port Elliot Rd roundabout (McCracken) with two circulating lanes and two-lane entries on Adelaide Rd and Hindmarsh Rd
B5 Roundabout slip lanes Left-turn bypass lanes at Torrens/Seaview/Eyre and Torrens/Crozier roundabouts, where the turning movement exists
B6 Retail closer to Encounter Bay Demand variant: a supermarket + services POI cluster in Encounter Bay (near Bay Rd / Franklin Pde)
BP Brent's package B2 + B3 + B4 + B5

Other options

Id Change Source
N1 Close or half-close the Grantley Ave rail crossing 2015–16 study: Seaview/Eyre roundabout reaches capacity in summer unless closed (S-D21 s13.3.15); 2017 left-in/left-out trial (S-D19)
N2+ Generated after the baseline shows where delay is (R16) —

Targeted options from the bottleneck diagnosis (S7)

Chosen from where the simulated delay actually is (sim/assumptions/S7-improvements.md, diagnosis of the 2025 summer and 2041 high-growth weekday baselines). Cost classes are rough orders of magnitude for comparison only ($ under $0.5 M, $$ $0.5–3 M, $$$ $3–10 M; assumption S7-04); none is a costed design.

Id Change Why (diagnosis) Definition used Cost class
N2 Roundabout at Armstrong Rd / Crozier Rd Worst single junction at 2041 high growth (Crozier Rd waits ~53 s per vehicle on a weekday) and the second-worst single approach in 2025 summer; B3 makes it worse Single-lane roundabout, ring radius 20 m (like the McCracken and Armstrong/George Main roundabouts), 3 legs, ring speed by the baseline's radius rule $$ (DIT arterial, rural roundabout)
N3 Crozier Rd approach flare at Armstrong Rd Cheap alternative to N2: today left- and right-turners share one lane, so left-turners queue behind right-turners waiting for a gap in both directions Last 40 m of the Crozier Rd approach get two lanes: kerb lane left, median lane right $ (line marking, some widening)
N4 Roundabout at Hindmarsh Rd / Grantley Ave (rail-crossing link to Bridge Tce) Worst approach in 2025 summer: Bridge Tce traffic turning right onto Hindmarsh Rd via the 17 m crossing link (~50 s per vehicle); N1 (closing the crossing) made things worse Single-lane roundabout, radius 12 m, centre moved 8 m west so ~13 m of the crossing link remains between the ring and Bridge Tce $$–$$$ (next to a level crossing: crossing protection and land on the west side needed)
N5 Ring-road junction roundabouts: N2 + Armstrong Rd / Greenhills Rd Greenhills Rd is the second ring-road give-way approach that fails at 2041 high growth (growth areas 1 and 3 load onto it) N2, plus a single-lane roundabout (radius 15 m) at Armstrong Rd / Greenhills Rd $$$ (two roundabouts)
N6 No right turn out of Granite St (onto Victoria St), Coral St (onto Torrens St) and Wattle Dr (onto Hindmarsh Rd) The worst side-street right turn on each of the three town-centre arterials in 2025 summer (27–48 s per vehicle; selection rule in S7-03) The right-turn movement out of each street removed; left turns and the turns into the street kept $ (signs; possibly a median)
N7 Combination: N5 + N4 The three worst junctions together (ring road for growth, Grantley for summer) N2 + Armstrong/Greenhills roundabout + N4 $$$
N8 Left-turn lanes on Victoria St eastbound into Oval Rd and the IGA car park The Victoria St corridor is the largest hotspot; 2,400 a day turn left into Oval Rd and 980 into the car park (summer 2025), slowing the one through lane Last 40 m before each turn: kerb lane left turn only, median lane through $
N9 Combination: N3 + N4 The cheap Crozier Rd flare (best Armstrong/Crozier result at today's traffic) with the Grantley roundabout N3 flare + N4 roundabout $$–$$$

Not built, with the reason in S7-improvements.md: roundabout metering signals (no roundabout approach in the diagnosis is starved by a dominant circulating flow except Eyre Tce, and its loss is small), better-designed signals at the C4 sites (the two roundabouts there are not bottlenecks today), a link road for growth area 1 (the demand model has no estate streets to connect it to), seasonal traffic management and a caravan route (no measured target in the model). C5 was first left out because the indicative alignment could not be georeferenced; it was built in S9 from the described end points and existing roads instead (rows C5 / C5b above).

Outputs per run

Accessibility (R14) and movement delay (R15) tables from vhsim.metrics; deltas vs X0/X1; foreshore exposure (R23a: trucks and caravans on Flinders Pde / Esplanade / past Warland Reserve); network totals. At least 5 seeds per run; report the spread across seeds.